Deye 125kW Commercial & Industrial Power Conversion System
The Deye 125kW High Voltage PCS provides advanced bidirectional power conversion for commercial and industrial battery energy storage systems.
Designed to integrate high-voltage lithium battery banks with three-phase electrical infrastructure, the unit supports controlled battery charging, discharging and energy management for demanding business environments.
Key Features
Bidirectional AC/DC Power Conversion
Enables controlled energy transfer between high-voltage battery storage and the AC electrical network, supporting efficient energy storage and discharge operations.
Intelligent Battery Energy Management
Communicates with compatible battery management systems to coordinate charging and discharging while supporting battery protection and operational monitoring.
Peak Shaving and Load Management
Supports commercial energy storage applications designed to manage peak electricity demand, improve energy utilisation and optimise electricity expenditure.
Modular C&I Energy Storage Architecture
Can be integrated with compatible Deye energy storage components to create scalable solutions for larger commercial and industrial installations.
Solar Integration Capability
Supports solar energy integration through a separate compatible Deye MPPT module and the appropriate system control architecture.
Flexible Energy Storage Applications
Suitable for commercial battery storage, grid-connected energy management and engineered backup solutions using the required switching and protection equipment.
Recommended Applications
- Manufacturing plants and industrial facilities
- Commercial buildings and office parks
- Warehouses and distribution centres
- Solar-plus-storage installations
- Agricultural processing facilities
- Commercial battery energy storage projects
- Grid-connected energy management systems
System Integration Requirements
The PCS requires a compatible high-voltage battery system and appropriate electrical protection.
For PV integration or backup transfer functions, compatible MPPT and static transfer switch equipment may be required.
The PCS alone is not a complete solar hybrid system. Final battery compatibility, grid compliance and system configuration must be verified before installation.






Reviews
There are no reviews yet.